ALBIOMA is involved in an Energy Transition program since 2018, the second project of this program was made possible by EDF and CRE in 2020 since then… loads of studies were made, contracts were signed… detailled engineering was reviewed…
I am proud to share some pictures of works ongoing on ABR harbor located on Reunion Island.
Within a few days the dome shell will be inflated, making the project even more visible to the public.
Many thanks to ALBIOMA Erection team:
PM – Louis OLLIVIER (https://www.linkedin.com/in/louis-ollivier-21676186/)
Local PM – Sylvain Lyons (https://www.linkedin.com/in/sylvain-lions-a903a56/)
To our Owner’s Engineer ATEIM (https://www.ateim.fr/fr), Subsidiary of EKIUM:
Sponsor – Christophe DESNOULEZ (https://www.linkedin.com/in/christophe-desnoulez-9838ab14b/)
PM – Michel HEBERT
To our dome CONTRACTOR, Dominion global ( https://www.dominion-global.com) – GTOI (http://www.gtoi.fr/):
Dominion – Fikri MOURABET (https://www.linkedin.com/in/fikri-el-mourabet-76b84848)
GTOI – Benjamin LEPOIVRE (https://www.linkedin.com/in/benjamin-lepoivre-4b26ab52/)
Fact sheet
- Each dome ~45 000m3 of pellets. Which is equivalent to the gross volume of the Paris’ Arc de Triomphe de l’étoile
- 52m diameter
- 38m height
Medias, all pictures are copyright GTOI
Related Posts
- ALBIOMA – TE – ALM1-2, Last Conversion !
- ALBIOMA – TE – ABR, nearly one year after completion
- ALBIOMA – Combustion turbine development.
- ALBIOMA – TE – ABR, Reunion Island harbor dome completion
- ALBIOMA – TE – ALG, Third Conversion !
Let’s keep contact

Vincent EUDIER is a 20 years experience Energy Project / Program Manager with strong emphasis on development,